The project was delivered to a medium-sized metal processing plant with high electricity demand and extreme susceptibility to electricity price fluctuations . Although the plant had previously deployed an on-site photovoltaic power generation system, its power generation mode did not perfectly match its production schedule. Therefore, during peak hours, a significant portion of its electricity consumption still relied on the grid.
The project includes a containerized EnerBank unit that integrates:
The system is pre-assembled and factory-tested, enabling a plug-and-play installation process and reducing on-site commissioning time. It is integrated with existing photovoltaic systems and supports automatic peak shaving and load shifting strategies. Remote monitoring is provided through the built-in EMS platform, enabling real-time system visualization and unattended operation.
Since its deployment, the battery system has delivered significant operational benefits. EnerShare anticipates that the project will:
Since its grid connection, the system has been operating stably, and its performance has been continuously monitored through an energy management platform.
This project further demonstrates EnerShare’s ability to provide reliable, scalable, and customized industrial and commercial energy storage solutions for European manufacturers.